Installation method of screw press

TIME:2022-12-30   VIEW:4

screw press

The application scope of screw press is also expanding, and it is continuously applied in many fields. As a waste solid-liquid separation equipment, I believe it has a broader prospect.

Application scope of screw press equipment: waste treatment (Daily domestic waste treatment, perishable wet waste, food waste, agricultural wholesale market waste, landscape and garden waste, agricultural waste, corn straw hay, farm waste, animal carcasses, slaughterhouse waste, food industry waste, Chinese herbal medicine waste, paper industry waste. Waste and energy, food crops, daily domestic waste treatment and chemical waste are targeted at energy, resource recycling, harmless and resource recycling to promote Application of waste recycling. The principle of the screw press is mainly to extrude the liquid in the material according to the extrusion molding. The extruded liquid is discharged according to the stainless steel screen, then gathered in the water storage tank and discharged through the drain pipe. The dried material is extruded through the inlet and outlet at the end of the stainless steel screen.

Installation method of screw press:

1. When installing the screw press, first make sure whether the opening specification of the basic anchor bolt of the manufacturer's display equipment is consistent with the sitting specification. When consistent, it shall be installed on the prefabricated components, and the nuts pointing to the parts shall be tightened and fixed. If not, please contact the manufacturer immediately for resale, and remember not to make up for inconsistent equipment.

2. After the basic part of the equipment is installed, the equipment support frame shall be installed and welded with the embedded thick steel plate to ensure the reliability of the equipment.

3. Then install the internal parts of the equipment. The staff first manually rotate the equipment reducer to check whether it rotates flexibly. If necessary, add appropriate lubricating oil for lubrication, so that some moving parts of the equipment are flexible and reliable. They can intervene and stay for five times. In addition, carefully check whether the reducer is suitable without reversing.

4. After all drive components are normal, they can be plugged in for full load test run. After the required time for full load of equipment, normal materials can be put into production.

Maintenance of screw press bearing;

1. If the bearing is damaged, replace it immediately. When installing a new bearing, be careful not to lose it. Avoid damaging the bearing and printing pressure.

2. During the whole process of using mechanical equipment, pay attention to the anti rust treatment of bearings, and do not touch too much water. Clean the area around the bearing pedestal, apply lubricant and carry out maintenance.


Copyright © 2022-2024 California Chuantai Machinery, INC. All Rights Reserved.

XML